Onshore and Offshore Development Methodology
Dynamic ITSolutions's proven repeatable solutions
consists of three phases.
Phase I - Architecture, Design &
Signoff
Phase II - Setup, Build and Test
Phase III - Pilot, UAT and deployment
Phase I - Architecture, Design &
Signoff
The onsite team will interact with the
Client staff in design of the database
Prepare and review acceptance criteria
document internally.
1. Detailed design will be done for all
the functions with the help of the client
staff and signed off at the end of the
phase.
2. Performance requirements and perceived
bottlenecks for the proposed system will
be documented.
3. Acceptance criteria of the system to
be delivered will be prepared.
4. Perform acceptance
5. Detailed design will consist of:
- Define/Refine standards
- Determine/Design details of operating
environment
- Confirm the functional design document
- Develop physical database design
- Review of the design documents by client
staff
6. User-Interface Design
The User-Interface design will be confirmed
and signed-off. At the end of (Phase 1)
this on-site visit, the Project Leader
will:
- Obtain client sign-off for the above-mentioned
activities
- Obtain sign-off on acceptance criteria
document
- Re-validate the proposal based on the
findings of this Phase
Phase II - Setup, Build and Test
The application details will be worked
out. Logic of each functionality, interaction
between client and server, web server
and business objects, batch processes
etc. will be defined, in detail.
- The database schema and table layouts
will be defined.
- Preparation of Unit test plan for the
software modules.
- Obtain client sign-off for the above-mentioned
activities.
Build, Test & Deliver:
- Generate test database
- Put configuration management in place.
- All the components of the system will
be built and validated.
- Group code walk through
- All the components of business objects
will be built and validated.
- The entire database server components
will be built and validated.
- Conduct independent unit test.
- Fix defects found in unit test.
- Successive as-is-ready components will
be integrated into mini-versions of the
final system.
- System integration testing is done after
the unit testing of all the software modules
is done and has met the - criteria of
the overall system.
- Prepare for integration testing
- Carry out integration testing.
- Fix defects during Integration testing.
- The final system will be delivered to
client along with necessary documentation.
Phase III - Pilot, UAT and deployment
The onsite coordinator with one analyst
Offsite will be available during this
phase to support acceptance, deployment
and training.
Acceptance test of the software
- Participate in acceptance
- Help Client do acceptance testing
Installation
- Prepare for installation
- Replicate software on designated platforms
- Perform trial installation
- Deliver software
Deployment of the software
Training of the Client IS personnel
Obtain acceptance sign-off from Client.